Friday, March 21, 2014

It's Coming Along


Roof and east side siding



Working on the north side

Along the north side

(Posted from the Madison County Library.)

Friday, March 7, 2014

Construction Update

(It's really a pain trying to keep up with a blog when you don't have internet service.)

Some recent progress on the house above Heck Creek . . .

The roof is on!

the last piece of roofing




The siding is going up!



Meanwhile, down in the utility meadow, the garlic is coming up.



(Posted from McDonald's in Weaverville.)

Friday, February 7, 2014

Construction update

Despite cold, rain, ice and snow, some work has been accomplished on the house above Heck Creek in the last month or so. The roof (minus the sheet metal) and decks are on. During the coldest days the carpenters worked indoors assembling the deck railings by the heater. Windows are in. (Richard admonished us not to remove the window labels until after all the inspections.) Rough plumbing and rough electrical work have been done.

looking up at the house

east face--bedroom and office windows


from up the hill


looking into the kitchen-dining-sitting room

Sunday, November 17, 2013

Construction!

.... At last.  We have the framing started on our little house.



Ralph, Richard (the contractor man) and Glen (chief carpenter) 
discuss the progress.

It was a beautiful day for viewing the progress--rusty red oaks and green pines 
on the gray hillsides beneath a brilliant blue sky.



And a view from above. 


Friday, March 1, 2013

What's happened at Heck Creek so far

We purchased the land in October, 2010--
42 acres of steep hillside in Madison County, NC.

Our big white oak and decrepit shed down by the creek

Summer 2011 we hired the father-son team of William and Edwin 
to install a culvert so we could get across Heck Creek, 
put in a driveway to the house site, excavate the house basement and 
install a sewer system.  

Ralph views the culvert


Edwin does the initial clearing of the driveway


Driveway grading


Robyn, Ralph and Rhiannon in the basement


Summer 2012 the well was dug,

Well-drilling truck


Ralph at the well head


 and the electric line run underground up the driveway.


The electric box


So now all we need to do is build the house!

 

 

Sunday, February 3, 2013

Happa says....

"I have inspected these tiles and approved them for use
in the House above Heck Creek."

Tuesday, July 24, 2012

Plan B

When last we visited with the contractor, his estimate was $50,000 over our budget. Ouch!  Something had to go, so back to the drawing board (actually the computer and TurboCad). 

I ended up reducing the size of the house by 20%.   The Springfield house is 2,400 square feet plus attic and cellar.  The first plan for the house above Heck Creek was 1,680 square feet plus basement.   The new plan is 1,344 square feet.  We had wanted to downsize, but that’s a lot of downsizing!



I took two feet off the east end of the house, making the bedroom and office each two feet shorter.  The rest of the reduction came off the west end.  Goodbye sun room and most of the living room.  That left a great room about the same size as the Springfield living room.   The great room will include the kitchen, dining table and a small sitting area around the wood stove.  We’ll finish part of the basement, making a den for the tv and the big couch, and the fiction collection.  We’ll also have bunk beds downstairs for extra sleeping.


I’ll most miss the sun room.  With all its windows and tile floor, it would have done triple duty as a greenhouse and worry-free Happa territory, along with providing some solar heat gain in the winter.  We can add a small lean-to greenhouse in the future for around $3,500 for a kit.  Happa will live downstairs --that means all electrical cords will need to be wrapped and the bookcases will need doors. (Happa says, “Books, yum, yum.”)

Wednesday, April 11, 2012

Wednesday, February 1, 2012

A Sink and a Rat


The House Above Heck Creek is going to be rather simple by most standards and we’re not planning on installing a dishwasher.  With just Ralph and me, most of the time there aren’t too many dishes to wash.   Ralph usually does the cooking and I wash up.  I envision one of those old fashioned, white enameled, cast iron farm sinks with a single bowl in the middle and drainboards on each side in the kitchen of the House above Heck Creek.  It just seems so practical.  You could put dishes waiting to be washed on one side and a dish drainer on the other.  Those plastic mats that go under the dish drainer are always grungy looking and never seem to deliver all the water to the sink. 

the sink I'd like to have

We just haven’t been able to find a sink in good condition at a reasonable price.  So, Ralph posted a want ad on Craig’s List.  Soon we hear from Bill who says he has a sink.  That weekend Ralph and I headed out in the pickup for the little town of Wasola, MO.  Bill had told Ralph to be prepared to get dirty and to bring a flashlight.  I’ve always heard tell of people finding forgotten furniture and other treasures in old barns and attics--maybe a nice table or dresser would be lurking under the dust in Bill’s storage building?  (Or maybe not.)

About an hour later we met up with Bill and his sixteen-year-old son Eli in Wasola and followed them to Bill’s storage building.  Bill told us he had been a truck driver until his back began to bother him.  He looked like the “good ol’ boy” type with a beer gut hanging over his belt.  Eli looked like he was going to grow up to be just like his dad. 
 

My first thought when I stepped into Bill’s storage building was that I was glad my tetanus shot was up to date.  In a former life, the building had been Bill’s father’s auto repair shop.  The floor was littered with oily car parts, broken headlights, bits of hoses and belts, pipes, sheet metal, rusty metal pieces, soft drink bottles and cans, nuts, bolts, screws, nails and other debris, all topped with about a dozen  rolls of yellow fiber glass insulation--no bare floor in sight.  It reminded me of some of the photos of Joplin after the tornado hit last May.   

Bill's storage building with Eli

We clambered over and through all the junk to the back corner where the sink sat.  Yes, it was a white enameled, cast iron sink with a single bowl and two drainboards, and (as far as I could tell under all the grime) it was in good shape.   Then Bill opened the cabinet under the sink and there was a huge rat’s nest with a huge rat in it.
 

rat

“I hate rats!” shouted Bill.  “The only thing I hate worse is ‘possums.  Eli, find me a stick!” 

Eli rummaged around for a minute and produced an aluminum carpenter’s level
about four feet long with a broken bubble tube . 

“That’ll do!” shouted Bill, taking the level from Eli and commencing to poke and prod in the rubble around the sink cabinet.


“I see it!”   Whack, whack, whack. “I hate rats!”  Bill triumphantly held aloft a rather large rat by the tail, slinging rat’s blood everywhere including all over the sink.

Now, I’m not especially squeamish and I’m not fond of rats, but I do find the killing of anything with such fervor and glee unsettling.
 

Maybe I’ll make do with this sink from Ikea. 



Sunday, January 1, 2012

The House above Heck Creek

The House above Heck Creek hasn’t been built yet.  We’re working on it. 

Years ago we had planned on moving out west--the Black Hills of South Dakota or maybe somewhere in Montana.  We made it as far west as Missouri.  Life happens and along the way the goal changed to simply moving back home to western North Carolina.  In October of 2010 we bought 40 acres or so of mostly wooded, steep to very steep land above Heck Creek in Madison County, NC.

Last summer we graded a driveway up to the house site and installed a septic system.  Maybe this year we can work on the house.

Meanwhile, Happy New Year from the Missouri Ozarks.


Heck Creek in July